Skip to content
Solum Invest GmbH
ProjectsCompanyContact
Legal NoticePrivacy Policy
LinkedInInstagram

Soluminvest

Automation systems for SMEs in the DACH region.

UID: ATU81665404FN 642566 a

Services

ProjectsFirst CallContact

Company

CompanyLinkedInFirmenABC

Legal

Legal NoticePrivacy PolicyGeneral Terms and ConditionsGeneral Rental Conditions
Staatlich geprüfter UnternehmensberaterLicensed Business Consulting
© 2026 Solum Invest GmbH
← References

Web Modernization

A complete website rebuild. 23 pages. 3.5 weeks.

Industrial Company, TyrolLive
23pages rebuilt
−49%JS bundle
3.5 wkto go-live
The Situation

The existing WordPress site reflected neither the product portfolio nor the company’s expertise. It was slow, cluttered, and barely usable on a smartphone.

Internally, a relaunch was seen as too expensive and too risky — and so it was postponed for years. The real risk, though, was standing in the market with a presence that made the company look smaller than it is.

„The real risk was looking smaller than the company actually is.“
The Approach

The hurdle wasn’t technical but a matter of speed and trust: a relaunch had to be predictable, fast, and possible without a months-long agency process.

Instead of a classic, drawn-out project, we set a clear scope and built in short steps — visible progress instead of long radio silence.

What We Built
  1. A full rebuild as a modern web app

    23 pages, responsive design, automated deployment, and SSL — on a foundation that grows rather than ages.

  2. Performance as a requirement, not an extra

    The JavaScript bundle was reduced by 49% and load time drastically improved — noticeable on every device.

  3. GDPR-compliant from the start

    Cookie banner and legal pages implemented correctly — the site isn’t just fast, it’s clean.

What the Client Gained
  • 3.5 weeks from first sketch to a production-ready website.
  • Load time drastically improved — JavaScript bundle reduced by 49%.
  • Fully responsive on desktop, tablet, and mobile.
  • Design quality at an international level (8.5/10 in the audit).
Learnings

The bottleneck in a relaunch is rarely the technology — it’s the fear of the project. Keep the scope small and clear and deliver in short, visible steps, and the relaunch loses its menace. Three and a half weeks isn’t a speed trick; it’s the result of discipline in scope.

← PreviousTwenty years of data chaos become a complete CRM and sales system.Next →Build too much too early and you fail. Prioritize right and you’re live in weeks.

Facing a similar challenge?

Tell us what's still running manually — we'll get back to you within 24 hours with an honest assessment.

Book a conversation →